Skip to Content

INDUSTRY STARTER PACKS


From scattered factory data to one digital layer in 60–120 days. Pick a use case. Prove ROI. Scale when ready.


Contact us

why starter packs

Classic MES or IoT projects take a year before showing results. FIWAREBox Starter Packs are pre-built MVPs that connect your machines, utilities, and processes to one NGSI-LD data layer in 60–120 days.

Each pack includes OPC-UA / MQTT / Modbus connectors, standardized data models, dashboards, and example datasets. 80% of the value for 20% of the cost.

We provide two ready-to-use services:

CHOOSE YOUR STARTING POINT


INDUSTRIAL AND FACTORY UTILITY (90 DAYS)
Occupancy, congestion, and flow dashboards.
COMPRESSED AIR MONITORING AND LEAKAGE (60 DAYS) 
Leakage detection and pressure optimization.
STEAM AND THERMAL ENERGY OPTIMIZATION (90 DAYS) 
Boiler efficiency and heat distribution.
HVAC AND PRODUCTION ENVIROMENT EFFICIENCY (60 DAYS) 

Temperature, humidity, CO2 in production zones.

MACHINE AND LINE TELEMETRY (90 DAYS)

OPC-UA/MQTT data from machines to dashboards.

INDUSTRIAL WATER AND PROCESS FLUIDS (90 DAYS) 

Consumption, quality, discharge monitoring.

PREDICTIVE MAINTENANCE SIGNAL CAPTURE (120 DAYS) 

Vibration, temperature, current — failure patterns.  

QUALITY AND TEST LAB DATA (90 DAYS)

Test results, tolerances, traceability.

OPERATOR SHIFT AND EVENT LOGGING (60 DAYS) 

Digital shift logs and event audit trail.

FACTORY DIGITAL TWIN MVP (120 DAYS)

Live data model of your factory floor.

Want the architecture walkthrough?

Want the architecture walkthrough? We’ll show how the data flows from shop floor to dashboard, how to start with one data source, and how to avoid twelve-month digitalization detours.

FIWAREBOX · ONE SHARED DATA LANGUAGE FOR INDUSTRY · EU OPEN STANDARDS (NGSI-LD) · YOUR INFRASTRUCTURE, YOUR RULES